Traffic at a construction ridden portion of a road in Southwest Lubbock will be re-opened.

Traffic along Frankford Avenue between 98th street and 114th street will be moved to the newly paved east side tomorrow after 10am.

The move is being made so contractors can widen the west side of the road. The streets, alleys, and driveways along the west side of Frankford will be systematically closed to be rebuilt.

Residents will need to seek alternative routes for these short term closures.

More From News/Talk 95.1 & 790 KFYO